This quad serves as a reliever to the Mach 1 Express.Fixed top bullwheel.Side view of the unloading ramp.View down the line.Middle part of the lift line.A hold down and support tower in close succession.Upper lift line.Drive station.Counterweight and loading area.
This lift almost never runs since the Mach I was installed. Its redundant with Chair 2 & Chair 3 / Mach I. As evidenced also by the fact there is no snow on the unload ramp.
This lift almost never runs since the Mach I was installed. Its redundant with Chair 2 & Chair 3 / Mach I. As evidenced also by the fact there is no snow on the unload ramp.
LikeLike
this lift usually runs during major ski races, but other than that it pretty much never used
LikeLike