This lift was originally ordered for 2023 installation but ended up opening a year later.The top terminal sits near the top of Holly’s first detachable, the Mach 1 Express.Upper half of the lift line with night lighting.Lower lift line.Side view of the bottom terminal.Loading area and short maintenance rail.Unloading area at the summit.View from the top of Mt. Holly.Upper station overview.Return terminal.Tower 5 with combination assemblies.The final few towers.Middle section of the line in the trees.Lift overview.Riding up the line.The bottom station seen from above.Arriving at the man made summit.Side view of the bottom station.LPA quad chair – the first model with bars at this mountain.
LikeLike