This lift was the first quad at Beaver Valley and replaced a Hall double.The quad also indirectly placed a Hall T-Bar, which served the upper part of Beaver North.A loading conveyor was added in 2015.Arriving at the summit.Fixed return station.Unloading area and bullwheel.View down at tower 9.Looking up the line at T3.Upper half of the line.Lower lift line.Doppelmayr Worldbook entry.