This lift was Alterra’s first installation at Snowshoe.The new lift runs in a similar alignment to a prior triple chair.View down at tower 15.Lift line overview.Upper part of the line.Tower 11.View up the line at tower 9.Middle section of the line.Tower 6.Looking up the line.The first few towers in the trees.Tower 2.Side view of the Peak model return station.Chairkit loading conveyor.Loading area.Another view of the conveyor.View uphill from the base terminal.Lift overview.Downhill end of the upper station.View from the summit.Skytrac quad chair.
I’ve heard rumors that Snowshoe wants to build a chondola to replace one of their existing detachable quads although I don’t remember which one it was.
Congratulations Peter for getting photos of every new public lift of the 2023-2024 ski season on lift blog.
LikeLiked by 4 people
Does Alterra plan any other new installations at Snowshoe?
LikeLiked by 1 person
I’ve heard rumors that Snowshoe wants to build a chondola to replace one of their existing detachable quads although I don’t remember which one it was.
LikeLiked by 1 person
The chondola will replace Ballhooter in 4 years. Construction will start in 2028.
LikeLiked by 1 person
The top station paint job looks kind of ugly.
LikeLike
This new lift is great, but it stops a lot.
LikeLike