Rueggli – Taos, NM

Rueggli is the second Skytrac fixed-grip for Taos after the Kachina Peak project.
The return terminal shares an operator house with the pulse gondola.
Short lift line.
Tower 5 and the top station.
This lift replaced two Stadeli beginner chairlifts.
Middle part of the line.
Monarch drive terminal up top.
Next to its sibling, Gondolita.

Leave a comment