This lift came used to Sunlight via Arapahoe Basin.View up the line from the base area.Loading area and Alpha drive.Lift line with another 2025 install in the background.Riding up the line during the inaugural season.Upper half of the line.Tower head from A-Basin.New towers from Leitner-Poma.Newer LPOA tower head.Nearing the summit.View back down from the top.Arriving at the return.Unloading area and operator house.Lift line overview.Tower 12.The first few towers in the base area.Side view of the drive station.Lift overview.