Sunrise Gondola – Park City, UT

This gondola provides uplift from the southern end of Canyons Village.
A double chair used to start in the same spot but followed a different alignment and ended much lower.
10 passenger Sigma cabins.
Individual upholstered seats and skinny ski racks.
The top terminal features a direct drive and a maintenance facility.
View down from the summit.
Tower 24 and a generator providing backup power to the lift.
Top unload area at Red Pine Lodge.
Tower 23.
View down the line at tower 21.
The lift line was designed to be as low and protected from wind as possible.
A four section splice tower.
Big breakover next to Red Pine Canyon.
Like the original Red Pine Gondola, Sunrise passes over Red Pine Canyon.
Below the canyon, the line crosses above Over & Out.
The chairlift crossing.
Large return terminal next to the Pendry hotel.
Hold down towers 1 and 2.
View riding up out of the base area.
Middle section of the line.
Breakover towers 14 through 16.
An epic view just like Red Pine Gondola.
Hold down towers 18 and 19.
Support tower 21.
Outside pedestal.
Red Pine Lodge area seen from High Meadow Express.
Downhill loading area.
Side view of a heavily loaded tower.
The canyon breakover seen from above.
Both gondolas crossing Red Pine Canyon.
A tall tower seen from Over & Out.
Side view of the line below the chairlift crossing.
Lift line just above Over & Out.
Closely spaced T5 and T6.
Lower lift line where the old beginner double used to run.
Tall tower 4.
T1 and T2.
Lower station with short maintenance rail.
Side view of the top terminal.
View of both gondolas and Red Pine Canyon.
RPG in the front, SG in the back.
A tower and cabin seen from above.
A new learning area was constructed as part of the Sunrise Gondola project.
Cabins in front of Iron Mountain.
Upper section of the line.
Three closely spaced towers.
Side view of the lower lift line.
Lower half of the lift seen from the Cabriolet.

Leave a comment