Turkey Trot – Holiday Mountain, NY

This lift was relocated to Holiday from Massanutten, Virginia, but received many upgrades along the way.
Side view of the new drive terminal from Partek.
Alongside the new lift, this trail also received new snowmaking and lighting.
Loading area.
The top terminal near the top of a previous double chair.
View down the middle part of the line.
Lower part of the line with a hold down tower.
Newly-galvanized tower.
View riding up the line.
Tower 8.
The top terminal with new operator house.
View from the summit.
’90s style Borvig chair.
Lift overview.

Leave a comment