This was the first Poma detachable in the entire state of Wisconsin.Side view of the compact bottom terminal.Loading area and maintenance rail.Tower 1 and the bottom terminal.View up at T3.Arriving up top.Side view of the Competition terminal.Unloading ramp.View down the line.Lift overview.
This lift is the last new Challenger terminal detachable built. The only ones built after were relocations.
LikeLiked by 1 person
I think Shooting Star was the last with a full length Challenger terminal as opposed to the compact ones here.
LikeLike