Doppelmayr built two similar Galaxy fixed-grip quads with CTEC chairs in 2005 and 2006 at Bromont.View down the lift line.Upper section of the line.Tower 2.The drive/tension station.View up the lift line from the base terminal.Departing the bottom station.Riding up an empty lift.View back down at T5.Arriving at the top.Colorful top station.Doppelmayr sheave assemblies.Lift overview.