1 – Beech Mountain, NC

For the 2022-23 season, Doppelmayr replaced an older double chair with this fixed grip quad.
View down the middle part of the line.
The final two towers.
Upper half of the line.
Lower half.
Tower 5.
View down at T4.
The loading area.
View up at tower 1.
Lower station with tensioning.
Loading conveyor.
Another view of the loading area.
View down at T3.
Upper station overview.
Fixed top drive, the third such station at Beech.
View from the summit.
Drive bullwheel.
Side view of the top station.
Downhill end of the unloading station.

One thought on “1 – Beech Mountain, NC

  1. Jake C February 4, 2023 / 11:59 pm

    Rode this lift today, and it definetly runs slower than lifts 5 and 6. Made the ride time close to 10 minutes.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s