2028 New Lifts

This is a list of new lifts likely to be built in the United States and Canada during the 2028 construction season.  Last updated 6/13/2026. Have an addition or correction? Comment below or email Peter@liftblog.com.

Blue = Doppelmayr
Yellow = Leitner-Poma
Green = Skytrac
Red = MND
Purple = Partek
Orange = SkyTrans
Gray = Re-installations (used lifts)
White = To be announced

ATW = Aerial Tramway
CL = Chairlift
G = Gondola
SL = Surface lift
D = Detachable
F = Fixed grip
M = Monocable
B = Bicable
P = Pulse
J = Jigback
B suffix = Bubble

One thought on “2028 New Lifts

  1. SkiLucas's avatar SkiLucas June 13, 2026 / 4:13 pm

    2028!

    Like

Leave a comment