This lift used to start much higher but was extended downhill in 2004.Drive-tension terminal.View departing the base station.Riding up.Tower 7, about where the lift used to load.Nearing the summit.View back down.Upper bullwheel.Looking down the line.Middle part of the line.View from the former bottom terminal site.I am not sure where all the extra towers and chairs came from.
This lift actually opened (in its much shorter configuration – started at current tower 10 or 11) in 1986 or 1987; two or three years prior to chairs 6 and 7 opening.
This lift actually opened (in its much shorter configuration – started at current tower 10 or 11) in 1986 or 1987; two or three years prior to chairs 6 and 7 opening.
LikeLike