Adventure – Stowe, VT

IMG_5094
Leitner-Poma Alpha fixed-grip terminal.
IMG_5095
View up the line.
IMG_5096
Looking up from the base.
IMG_5097
Bottom terminal during summer construction.
The entire lift seen from Mt. Mansfield.
Alpha bottom terminal and loading area.
Looking down the lift line.
The last few towers.
Leitner-Poma Z model station.
Unload ramp.

6 thoughts on “Adventure – Stowe, VT

  1. northeastchairlifts May 26, 2017 / 8:41 pm

    Like

  2. Benjamin Edwards January 31, 2020 / 7:50 pm

    Has Leitner Poma ever made a fixed-grip double?

    Like

  3. Chris January 31, 2020 / 8:54 pm

    Leitner has built plenty in Europe, even fairly recently

    Like

  4. Benjamin Edwards September 29, 2020 / 5:02 pm

    They upgraded Castlerock at Sugarbush.

    Like

    • beast coast November 26, 2020 / 11:02 pm

      How do you know this?

      Like

Leave a Reply to northeastchairlifts Cancel reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s