Alpine Greens – Yellowstone Club, MT

This short tramway connects the Eglise trail system to homes along the Yellowstone Club golf course.
Side view of the top terminal.
Unloading area.
Top bullwheel and an Omega IV cabin.
The upper terminal houses the tension system.
Tower 2 with Lone Peak in the background.
Two of the three towers.
The lift crosses over Third Yellow Mule Creek.
European style tower head.
The communications lines have their own towers to support spanning the creek.
Drive terminal.
Side view of the loading area.
Lift overview.
The lift line. It looks like maybe the first logging was in the wrong spot.
Another look at the bottom station and tower 1.

4 thoughts on “Alpine Greens – Yellowstone Club, MT

  1. Randy June 20, 2021 / 10:39 am

    Only 2 cabins on the line?

    Like

    • Doppelmayr FTW June 20, 2021 / 12:34 pm

      It operates as a jig back tram, hence only having 2 cabins.

      Like

      • Donald Reif June 20, 2021 / 1:48 pm

        If it were a pulse, there’d be a way for cabins to travel around the bullwheel.

        Like

        • Owen Mitchem June 20, 2021 / 6:53 pm

          Why build a tram like this instead of a pulse gondola?

          Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s