This very long Mueller double services intermediate terrain.Lift overview.Looking up the lift line from the bottom station.View leaving the base area.This lift typically only runs on weekends.Lattice tower.Tower 8.Mueller tower head with added lifting frame.These Partek chairs are not original.Updated chair design.Nearing the summit.A mix of lattice and tube breakover towers.Fixed top bullwheel.Bullwheel unloading.Tower 20 and the top station.View from the summit.Middle section of the lift line.Lower line.