Beaver Run SuperChair – Breckenridge, CO

img_2829
Beaver Run has updated Poma Omega chairs.
img_2832
Looking up the lift line.
img_2845
Lower station at the Beaver Run Resort.
img_2850
Poma built only a few Poma high speed quads with this terminal style.
img_2852
Loading zone.
img_2853
Grip maintenance facility and rail.
img_2856
Crossing under the Peak 8 SuperConnect.
img_2862
Tower 11.
img_2867
Unloading ramp at the summit.
img_2873
Top station from below.
img_2874
Upper lift line view.
img_2876
Lift overview.
img_2879
Middle portion of the line.
img_2928
Drive station.
Advertisements

15 thoughts on “Beaver Run SuperChair – Breckenridge, CO

  1. Benjamin Bartz August 11, 2017 / 9:32 pm

    Most of the new chairs were originally replacements on the old Colorado SuperChair. Once that lift was replaced the chairs were brought over to help upgrade Beaver Run, with additional chairs purchased to fill the longer line.

    Liked by 1 person

    • powderforever21 July 31, 2019 / 1:28 pm

      Didn’t look like it was running at full speed in the vid was it or was it not?

      Like

      • Donald Reif July 31, 2019 / 9:41 pm

        I think that this is 1,000 fpm:

        And this is 1,050 fpm:

        Like

        • Collin Parsons October 1, 2019 / 10:16 pm

          Second one is about 1000, not 1050 which would be over the lift’s design speed. It’s so cool to see an old detachable running full speed. Good motor sound too.

          Like

  2. Donald M. Reif March 17, 2019 / 10:32 am

    Much like the Cinch Express at Beaver Creek, this lift used to have a name that is now used on another lift. This was actually the first Mercury SuperChair, and only given its current name of the Beaver Run SuperChair in 1993, three years after it opened. The Mercury SuperChair name was then given to the mid-mountain high speed quad built in 1997 to replace Lift B.

    The upper Peak 9 high speed quads replaced two of the four Riblet double chairlifts that used to serve the upper slopes. That’s why the fixed grip lift lettering on Peak 9 has no Lift B or Lift D. The Beaver Run SuperChair replaced Lift D, which ran from Beaver Run up to about where the EpicMix racecourse on Sundown is located. Part of Lift D can still be seen today, as it was repurposed as a ski patrol lift evacuation training area (you’ll see it to your right on the Beaver Run SuperChair right after crossing under the Peak 8 SuperConnect).

    I think I once read somewhere that this lift used to have 219 chairs before they trimmed it down to the current 186 for practical purposes (I don’t see how 219 chairs could work without a lot of misloads; I think one of those old chairs is the Poma Competition chair you see on the Lift D rope evac training line).

    Like

    • The chairs are spaced about 96.5 feet apart here. That’s slightly larger than the 95 foot spacing of chairs on the Mercury SuperChair. I think if there was a time when there were 219 chairs on the lift, they would’ve been spaced about 85 feet apart.

      Like

  3. Kaden K July 30, 2019 / 10:48 pm

    Why did they replace the chairs?

    Like

    • John July 31, 2019 / 10:01 am

      The originals were at or beyond their design lifecycle. We had the same ones on our old Eagle lift, and we were repairing more and more every year. Since they had the ones from the original Colorado already, it made sense to put them on.

      Like

      • Donald Reif July 31, 2019 / 9:29 pm

        It also allows a degree of parts uniformity, because now all of the quads and the older six packs have Omega chairs. (The only ones to not have Omegas are the newer high speed six packs, which have LPA chairs)

        Like

      • Donald Reif October 10, 2019 / 2:01 pm

        And there’s the fact that Peak 9 doesn’t really need additional uphill capacity on the main face, as the two high speed quads (Beaver Run and Mercury) combined offer 5,600 pph capacity. And between those two, the Beaver Run SuperChair is primarily the one you use for longer runs and for if you’re starting out at Peak 9 base area / coming to Peak 9 via the Sawmill catwalk, while the Mercury SuperChair is the one you use for lapping the upper trails. So it evens out.

        Like

  4. Jonathan October 11, 2019 / 11:25 am

    This lift needs to be replaced, and soon. I was wondering if a 6/8 chondola with a capacity of 3,400/hour would be a good replacement for the lift. There would be cabins every 8 chairs instead of every 4-5 chairs. The cabins would be used for guests who want to ride up in the comfort of a gondola or for the beginner ski school. I have seen very long lines on this lift and Mercury. This may also reduce traffic on Quicksilver as well. If Breck wanted to, they could use the chondola in the summer for biking or scenic rides over on Peak 9. Let me know your thoughts.

    Like

    • Donald Reif October 11, 2019 / 5:44 pm

      True, this is the primary lift from which to access Bonanza, which is Peak 9’s designated intermediate learning trail. But adding any more uphill capacity would clog Bonanza more. And the foot traffic that uses the lift is primarily employees who work at the Overlook restaurant. I would like them to upgrade Lift C to a high speed quad first, as I think that would disperse some traffic away from the Mercury and Beaver Run SuperChairs, especially for those lapping the trails north of American. There was actually a master plan a few years back that had a Lift C replacement on the proposals.

      As for using an upgraded Beaver Run SuperChair for scenic rides/bike hauls, well, I don’t know if Breck would be up for doing a secondary summer operation that’s away from the main one at Peak 8 base.

      Like

    • Donald Reif October 12, 2019 / 11:40 am

      Upgrading the Beaver Run SuperChair to anything with a wider line gauge than a quad would also have the additional hurdle of “would the chairs still fit through the point where they cross under the Peak 8 SuperConnect”? Because from what I’ve seen, six pack chairs would come pretty close to tower 2 on the SuperConnect, possibly necessitating that the SuperConnect’s towers there be moved, requiring more work.

      Right now, I don’t think any of Breck’s master plans have called for this lift to be touched for now. Although maybe things will change after 2021, if the Peak 7 infill high speed quad gets built.

      Like

Leave a Reply to Kaden K Cancel reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s