Big Mountain Express #1 – Whitefish Mountain, MT

IMG_7848
Return terminal with gondola cabins on line for summer operations.
IMG_7851
This lift replaced an older Doppelmayr high speed quad.
IMG_9296
Bottom terminal in winter.
IMG_9325
Looking down from tower 8.
IMG_9337
View up the line.
IMG_9339
Lift line view.
IMG_9345
Top terminal with maintenance rails.
IMG_9349
The drive terminal is longer than most Uni-GS terminals that were built.
IMG_9354
Gondola cabins parked for the winter.
IMG_9514
View down line.
IMG_9517
Lower lift line.
IMG_9530
Lower station and depression tower 1.
IMG_9532
Breakover towers.
IMG_9566
Loading area.
IMG_9579
Doppelmayr CTEC tower.
Advertisements

9 thoughts on “Big Mountain Express #1 – Whitefish Mountain, MT

  1. Cooper January 15, 2018 / 5:33 pm

    Its technically a chondola in the summer but a normal high speed quad in the winter!

    Like

  2. Collin January 15, 2018 / 5:42 pm

    Any idea where the cabins came from? They clearly weren’t new since the lift was built in 2007 and CWA discontinued that cabin design in 1997.

    Like

  3. Max Hart January 15, 2018 / 7:26 pm

    They could have been used on the old Glacier Chaser Express as well, which is from 1989, and these cabins are from that era. Obviously they must have been refitted with new Agamatic-104 grips (replacing the old DS-104 grips), and possibly new hanger arms as well.

    Like

  4. Collin January 15, 2018 / 9:20 pm

    I wonder if it would be possible to modify the terminals so that the cabins could be used year round and it be a chondola. The issue would be terminal speed as it’s always faster on chairs than gondolas. In the summer they just run slower so it wouldn’t be an issue there.

    Like

    • Max Hart January 16, 2018 / 8:54 am

      In theory, in order to slow down one side of the terminal to permit gondola loading, you would really just have to change 2 belts in the entire contour, and the diameter of the end wheel they are spinning. However, the cabins are not level-walk-ins, and in order to make a gondola that one can actually load, they would have to pour concrete for an entire loading platform. It might cost more than its worth (in terms of the on-mountain experience) to convert to a Chondola, but it’s a cool and very possible idea nonetheless.
      On a similar note, this may the only Uni-GS that runs with cabins at some point during the course of the year. I can’t think of any others off the top of my head.

      Like

      • Duncan November 8, 2018 / 7:52 am

        So there are no UNI-GS gondolas? Did Doppelmayr build no gondolas during the GS period? (Other than UNI-G lifts shipped across the pond)

        Like

        • AvocadoAndy November 8, 2018 / 8:18 pm

          What cabins are those? Their geometry doesn’t resemble anything I’ve seen.

          Like

        • Peter Landsman November 8, 2018 / 8:21 pm

          They are the CWA Ethos. Also found on one of Tremblant’s gondolas.

          Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s