Before the two CTEC lifts open, Chair 6 was the easternmost lift at Dodge Ridge.Upper half of the line.Breakover towers.The top of the unload ramp is a wooden structure.Tall top bullwheel structure for snow loads.View down the lift line.Top tension bullwheel with counterweight behind.Unloading spot view.Chairs keep going until the turnaround beyond the unload ramp.Side view of the top.Yet another bottom vault drive.Tower 1 loading.Lift line view.Bottom station overview.View riding up near the summit.Looking back down the line.