East River Express – Crested Butte, CO

The East River Express is the third lift to run in its alignment and opened in 2006.
Return station overview.
Leaving the bottom terminal, which can only be approached from one side.
Riding up the first part of the line.
View down a steep section of the line.
Upper lift line.
Arriving at the Omega drive terminal.
Unloading area and operator house.
Top station with hydraulic tensioning.
View down from the top station.
Lower part of the line.
A tall combo tower.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.