Lift line with Lone Peak in the background.Top tension terminal.Lift line.Bottom terminal in Mountain Village.Bottom vault drive.Looking back down the line.Top station.
The new gondola will most likely be a Doppelmayr, seeing how Boyne has always worked with Doppelmayr and has a great relationship with them. It would be weird for one of the flagship lifts at Big Sky to be Leitner-Poma when almost everything else that is new is a Doppelmayr.
This lift is going to be replaced with a gondola?
LikeLike
the gondola will run up this line with a mid-station at the top of this lift, it will then continue up to where the old gondola 1 ended
LikeLiked by 2 people
Leitner Poma?
LikeLike
Not Leitner-Poma, this lift is Heron-Poma.
LikeLike
no not this lift but the proposed gondola.
LikeLike
Will the new lift be a leitner poma lpa gondola?
LikeLike
The new gondola will most likely be a Doppelmayr, seeing how Boyne has always worked with Doppelmayr and has a great relationship with them. It would be weird for one of the flagship lifts at Big Sky to be Leitner-Poma when almost everything else that is new is a Doppelmayr.
LikeLike
Hopefully uni g
LikeLike
or uni gv
LikeLike
It’s probably going to be D-Line, if/when it happens.
LikeLike
if it is i am going to evacuate big sky and go to sunday river. also d line is also not going to be 8 passenger gondola option.
LikeLike
https://ibb.co/bNjqRSs
LikeLike
https://ibb.co/XXQZkhj
LikeLike
that is how
LikeLike