Fil-neige – Ski La Tuque, QC

This T-Bar leaves from a large building and services the entire mountain.
There are three official offloading points.
View down from beginner unloading area.
A tower.
Second unload point at tower 7.
The lift crosses two gullies with large bridges for upbound skiers.
Upper part of the lift line.
View down near the summit.
Second bridge near the summit.
Top return bullwheel.
Upper station overview.
Lower lift line and drive terminal building.
View up from the base area.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s