This lift services the east side of the mountain.This was probably a relocation from another ski area.Top terminal with counterweight tensioning.Flyover unloading.Another view of the return bullwheel structure.Lower part of the lift line.Bottom terminal with two towers adjacent.Upper lift line.Hold down tower 6.View up the line.Tower 5.Middle section of the line.Tower 4.
I did some digging. This lift was installed between 1993 and 1998, though I was unable to pinpoint the year of installation. Definitely a relocation from somewhere.
This lift replaced a T-Bar when it was installed. Blue also replaced a third T-Bar in 1985.
I did some digging. This lift was installed between 1993 and 1998, though I was unable to pinpoint the year of installation. Definitely a relocation from somewhere.
This lift replaced a T-Bar when it was installed. Blue also replaced a third T-Bar in 1985.
Here is a photo of one of the original T-Bars: