When the Summit Express was installed in 2015, this lift was constructed out of two removed lifts to open a new expansion area.The bottom terminal and chairs came from the old Summit 1 lift.Many towers came from Summit 2, which still operates in a shortened alignment.Doppelmayr tower and CTEC chairs.Enterprise model drive station.Upper part of the lift line.Middle lift line.Near the summit.Lift line overview.Last tower and top terminal.The top station was manufactured new.