Gunther’s Way – Sugar Mountain, NC

When the Summit Express was installed in 2015, this lift was constructed out of two removed lifts to open a new expansion area.
The bottom terminal and chairs came from the old Summit 1 lift.
Many towers came from Summit 2, which still operates in a shortened alignment.
Doppelmayr tower and CTEC chairs.
Enterprise model drive station.
Upper part of the lift line.
Middle lift line.
Near the summit.
Lift line overview.
Last tower and top terminal.
The top station was manufactured new.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s