Hawk Express – Mt. Washington, BC

The second detachable lift built at Mt. Washington is a merger-era Doppelmayr CTEC Stealth 2000 model.
Riding up the lift line.
The old double chair took a completely different alignment crossing the current one around tower 6.
The top terminal and last tower.
View down the line.
Upper part of the line.
A Garaventa chair and grip.
View up the line near the summit.
Lower part of the line.
Line overview.
Riding up.
View back down the lift.
Arriving at the drive station.
View from the top.
Upper station seen from Boomerang.
Side view of the Stealth III.
Unloading area.
Rear and of the top station.
Another look down the line.
View up from the base area.
Lift overview.
Wide open lift line.
Doppelmayr Worldbook entry.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s