Hellroaring #8 – Whitefish, MT

This lift was entirely relocated from one part of Hellroaring Basin to another in 2021.
Side view of the relocated top drive terminal.
Skytrac tower next to a CTEC tower.
Upper lift line.
View from the summit.
View down the line.
Skytrac did the relocation and added bars to the chairs.
Two of the 18 towers are new from Skytrac.
View up the steep part of the line.
The first few towers.
Tower 3.
Lower station overview.
Loading area.
Skytrac also converted the lift to hydraulic tensioning.
T1.
View riding up.
View back down the line.
The last carrier is a special ambulance chair for toboggans.
The first of two Skytrac tower heads.
Upper lift line.

8 thoughts on “Hellroaring #8 – Whitefish, MT

  1. wolf's avatar wolf February 12, 2022 / 9:35 am

    Nice photos! Can´t wait to see the new six pack.

    Like

  2. Donald Reif's avatar Donald Reif February 19, 2022 / 10:40 pm

    I wonder what is up with the need for a slight descent into the upper terminal. I think it’s got to do with that last tower being integrated into the drive. Incidentally, it was a regular support tower in the old alignment:

    Like

    • Chase's avatar Chase February 20, 2022 / 8:22 pm

      Looks like for ski-under clearance.

      Like

      • pbropetech's avatar pbropetech February 20, 2022 / 8:33 pm

        Agreed. Definitely nothing to do with whether or not the sheave assembly is part of the terminal- one can engineer whatever configuration one needs in this case.

        Like

  3. Pat's avatar Pat November 29, 2023 / 3:37 pm

    FYI – The red toboggan chair was removed in 2022 :/ booo.

    Like

  4. PalisadesGlazer's avatar PalisadesGlazer August 27, 2025 / 6:03 pm

    Does anyone know why this lift was relocated? It seem like that was a bad idea considering it made previous runs out of bounds.

    Like

    • Ryan Murphy's avatar Ryan Murphy August 27, 2025 / 9:05 pm

      It’s much easier to access the terrain you actually want to ski. The terrain that is now out of bounds is protected grizzly habitat, and was required to close on April 1st every year. If Big Mountain wants to, they can run this later in the spring season now.

      Absolutely a wise decision to relocate.

      Liked by 1 person