This six-pack replaced an older Borvig triple.Steep upper section of the line.View up the lift line.The bottom terminal has tensioning but not drive.90-degree loading.Loading area and terminal.View up from tower 1.Six passenger chairs near the summit.Drive terminal.The breakover.Top station overview.Underneath the drive station.
3 thoughts on “Highlands Express – Wintergreen, VA”
GarretJanuary 25, 2020 / 12:50 pm
It looks like there is a gap in chairs near the top of the lift. There also appears to be a gap in between chairs that is smaller than the other gaps. Does anybody know why?
It looks like there is a gap in chairs near the top of the lift. There also appears to be a gap in between chairs that is smaller than the other gaps. Does anybody know why?
LikeLike
That’s definitely not an “End of chairs gap”.
LikeLike
There is no end gap. Wintergreen normally takes the chairs at the off during the summer for Virginia state inspection
LikeLike