This Mueller double features upgraded grips, some lifting frames and a Doppelmayr return terminal.Bottom terminal building and tower 1.Bottom station.Riding up the line.View down the lower part of the line.Middle lift line.View back down.Breakover tower with lifting frame.Lattice tower 13.Unloading ramp.This terminal was built by Doppelmayr.Upper station.View down from the summit.Steepest section of the line.Lower part of the line.
Second hand chairs from Red Mountain’s Granite were installed around 15 years ago. They spread those chairs on some other lifts as well. The maintenance on these old lifts must be a big challenge. Every lift needs a full replacement at Mont Sutton.
Those are quite the interesting grips. Any idea as to the manufacturer?
LikeLike
Those are new Mueller grips, yes a form of Mueller still exists.
LikeLike
Second hand chairs from Red Mountain’s Granite were installed around 15 years ago. They spread those chairs on some other lifts as well. The maintenance on these old lifts must be a big challenge. Every lift needs a full replacement at Mont Sutton.
LikeLike