III – Mont Sutton, QC

This Mueller double has a Doppelmayr top terminal.
This mid mountain lift connects the two main base areas.
Just about every tower on this mountain has a tree planted in front of it.
The last lattice tower.
View down the line.
Lower part of the line.
Looking up the line.
Portal tower 1 and the bottom terminal building.
Drive station.
Loading area.
Drive bullwheel.
Manufacturer plaque.

One thought on “III – Mont Sutton, QC

  1. Powderhound's avatar Powderhound December 7, 2021 / 11:18 am

    This chair should be replaced and extended to the summit to offload crowds from #2. It would let you start the day directly on the upper mountain. Another of the chairlifts using Red Mountains old Granite chairs.

    Like

Leave a comment