This is the first Leitner-Poma lift at Mt. Rose, built in 2022.Loading area and maintenance rail at the bottom terminal.View up the lift line.The bottom terminal seen from nearby Northwest Express.Tower 12 and the top station.The new lift ends significantly higher than the old Lakeview.Tower 10.Middle part of the lift line.Tower 1.LPA top station.This is the return terminal.Unloading area.Top ramp.Another view of the top station.View from the summit.Towers 11 and 12.Looking down the lift line.LPA chair imported from Europe.View down at T7.Tower 4.Lower station overview.LPA grip, hanger and taco.View back down the line.Riding up near the summit.Arriving up top.Return terminal underskin.Tower 7.View down at T5.The first few towers.View up from tower 3.Side view of the bottom station.Lift line overview.
I love the look of the blue seatbacks on the chairs.
LikeLiked by 2 people