This Hall double services the main face at Campgaw.The bottom terminal with bullwheel removed for maintenance.Lower part of the lift line.The top terminal.Return bullwheel.View down from the summit.Tower 8 next to the upper station.Hall slatted chair.Looking down the line.Upper half of the line.Loading area at tower 1.View up from the base area.
This lift has not been open for years. A part broke at the start of the pandemic, and the replacement was all the way in Europe, so it took like 2 years for it to arrive. I have not been to campgaw this year so I am not sure, but i think that it is open this year.
I talked to the head of ski school there, she says that it’s because they dont have enough staff now that the lift is repaired. I hope they start it up this year, i really like the slatted hall chairs
FAKE NEWS. You should be ashamed for spreading total bullshit. The lift has always been operational, it ran during the pandemic, and continues to run today!
This lift has not been open for years. A part broke at the start of the pandemic, and the replacement was all the way in Europe, so it took like 2 years for it to arrive. I have not been to campgaw this year so I am not sure, but i think that it is open this year.
LikeLike
I talked to the head of ski school there, she says that it’s because they dont have enough staff now that the lift is repaired. I hope they start it up this year, i really like the slatted hall chairs
LikeLike
FAKE NEWS. You should be ashamed for spreading total bullshit. The lift has always been operational, it ran during the pandemic, and continues to run today!
LikeLike