This lift replaced a Hall double in 2010.Doppelmayr Eco drive.Riding up the line.Top terminal with tensioning.View down the line.Upper part of the lift.Drive station side view.Upper station.Unloading area.
We call this “chair 2” The chairs were put in from West to East- Chair 1-double Hall then Chair 2-double Hall on Lookout-Then chair 3-double Hall on Bakke-Then chair 4-double Hall on the East Side-Chair 5-triple Riblet on Sunrise Mountain-Chair 6-Doppelmeyer in the Back Bowl. That is why we call the chair in the beginner area “chair 0”. It was West of chair 1. We should have called the West and East Quads “2 and a half and 3 and a half because they are between chair 2 and 3 and chair 3 and 4 respectively.
We call this “chair 2” The chairs were put in from West to East- Chair 1-double Hall then Chair 2-double Hall on Lookout-Then chair 3-double Hall on Bakke-Then chair 4-double Hall on the East Side-Chair 5-triple Riblet on Sunrise Mountain-Chair 6-Doppelmeyer in the Back Bowl. That is why we call the chair in the beginner area “chair 0”. It was West of chair 1. We should have called the West and East Quads “2 and a half and 3 and a half because they are between chair 2 and 3 and chair 3 and 4 respectively.
LikeLike