Before the chairlift was built, this lift was the only way to access the upper mountain.Drive station at mid mountain.Tower 1 with night lighting.Steep lower part of the lift line.This lift is quite long with towers spaced far apart.View down the track.Summit view.Upper station with tensioning.Side view of the top bullwheel.
2000ft that’s a nice long one.
LikeLike