In 1989, CTEC was tasked with adding a second double parallel to the Little Whiteface Hall.
CTEC terminal modeled after the Hall one next door.
View up from the loading area.
Lift overview.
CTEC replaced the Hall towers up to the end of Mountain Run.
View up at tower 4.
Looking down the steep lift line.
Upper part of the lift.
CTEC towers and chair bails with Hall seats from another lift.
View down from the summit.
Side view of the unload.
’80s-style CTEC tower.
Hall top bullwheel.
Unload ramp.

11 thoughts on “Mountain Run – Whiteface, NY

  1. Collin Parsons's avatar Collin Parsons October 15, 2018 / 7:02 am

    This lift was built using components from the Valley Double, lift 1A. The drive, chair seats, and line gear were all used parts. The non-tandem towers were also reused from the lower section of the Little Whiteface lift, but with CTEC crossarms. The return bullwheel is Hall, but mounted on a CTEC structure. I’m addition to the towers, they added new chair frames and hydraulic tensioning.

    With the installation of the gondola and removal of the Mid Station Shuttle Lift (1B), this lift rarely runs. It only ran 10 days at most last season and often not for the entire day. It made sense to install it pre-gondola because the Little Whiteface lift has very little capacity and it allowed the traffic going to mid and the top to be split.

    Liked by 1 person

  2. Collin Parsons's avatar Collin Parsons February 17, 2019 / 8:55 pm

    This lift ran today and so did Little Whiteface. Normally it’s one or the other. That means it’s usually bad news if this lift is running because Little Whiteface is down and the gondola line is going to be nuts. It was so cool getting to see both lifts in action, just like the pre-gondola days (which I wasn’t alive for).

    I took a video of this rare occasion. https://www.youtube.com/watch?v=QQzWyBt1Rb4

    Liked by 1 person

      • kelly's avatar kelly August 1, 2025 / 7:14 am

        And wasn’t this the last mountain run double ever ran before the replacement of both lifts this summer

        Like

        • kelly's avatar kelly August 1, 2025 / 7:15 am

          last time it ever ran>

          Like

  3. Kelly's avatar Kelly March 19, 2025 / 4:46 pm

    this lift hasn’t run in years the little white face got some new poles is there any plans to replace this clunker set up? It’s embarrassing

    Like

  4. Kelly's avatar Kelly March 19, 2025 / 4:49 pm

    “Whiteface…the lift on the left has not run in years.

    The lift on the right got some new poles in the upper half and some new gears around 5 years ago.

    Are there any plans to replace this clunker setup to the top of Little Whiteface? It is nostalgic, but it is embarrassing” Quote from a facebook post from ski the northeast

    Like

  5. Coloradoskilifts's avatar Coloradoskilifts May 15, 2025 / 5:37 pm

    Will Whiteface be replacing this lift with another one, or will the new Little Whiteface service the terrain off this?

    Like

    • SkiLucas's avatar SkiLucas May 15, 2025 / 7:42 pm

      Mountain Run will not be getting replaced. The new Little Whiteface Double will keep the mid-station, so you could get off there, and you can access all of the terrain previously served by Mountain Run from Approach anyways.

      Like

  6. Kelly's avatar Kelly July 16, 2025 / 12:18 pm

    Of Little Whiteface

    Like