Platinum – Red River, NM

The Platinum Chair replaced a Riblet double called Red. For the triple’s first few years, it was known as Red as well.
The first section of the lift.
Return bullwheel with hydraulic tensioning.
Tower 1.
View up the long line.
There is a mid unload at tower 16.
Unloading ramp.
Breakover towers up top.
Unload ramp number two.
Doppelmayr CTEC Uni-Star top station.
Side view of the upper terminal.
Mid unload.
Upper part of the line.
Side view of the midstation.
Lower part of the line.
View up the lift.
Tower 6.
The first few towers above the town of Red River.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s