Primo – Sunlight, CO

This Leitner-Poma quad replaced a Riblet double in 2025.
Running from near the base to the summit of the mountain, this lift takes roughly 12 minutes to ride.
Z model return station.
Loading area.
Leitner-Poma tower head.
View back down.
Middle part of the line.
Arriving at the summit.
Tower 15.
Alpha drive station at the summit.
Side view of the top station, one of five Alphas built in ’25.
Drive station with old drive station in the background.
Breakover towers.
View down at T14.
Tower 11.
Middle part of the line.
Chair 1.
Lower lift line.
Lift overview.

Leave a comment