Quad – Saskadena Six, VT

This modern quad chair replaced an old Borvig double in 2016 with a grant from a local nonprofit.
Leitner-Poma operator house up top.
There are only 8 towers.
Another view of the top bullwheel.
Lower section of the line.
Breakover towers.
Bottom terminal seen from above.
Leitner-Poma Alpha terminal.
Lift line overview.
Baby blue terminals just like the 1960s.
The entire lift.

5 thoughts on “Quad – Saskadena Six, VT

  1. Somebody's avatar Somebody November 12, 2019 / 5:55 pm

    I think this was the only new lift installed on the East Coast after the infamous 2015-2016 season.

    Like

    • SkiLucas's avatar SkiLucas March 24, 2026 / 3:36 pm

      Not even close to the only lift installed for 2016-17.

      Like

      • SkiLucas's avatar SkiLucas March 24, 2026 / 3:37 pm

        On the East Coast.

        Like

  2. Michael Stahler's avatar Michael Stahler February 5, 2022 / 10:07 pm

    Did they reuse the same bullwheel assembly at the summit?

    Like

  3. SnowNGR's avatar SnowNGR February 23, 2022 / 5:59 am

    That return sure looks strange. Did the modify the Snow Bowl return to meet newer bullwheel retention regulations, or is this a regualrly produced model?

    Like

Leave a reply to SkiLucas Cancel reply