Red – Chicopee, ON

This lift indirectly replaced a Poma double chair on a longer alignment.
For some reason it opened very late during its first season, 2024-25.
View from the summit.
Tower 4 and the top terminal.
The upper station was built up on a large berm.
View down at tower 3.
Upper lift line.
Tower 1.
The only Alpha drive station produced by Leitner-Poma in 2024.
Lift overview.
Loading area and motor room.
Side view of the bottom station.
View down from the summit.
Lift line crossing over a terrain park.
Omega chair.
Looking up the lift line.

3 thoughts on “Red – Chicopee, ON

  1. Carson's avatar Carson January 23, 2025 / 9:44 pm

    I spy an old top terminal in pic 8

    Like

    • reaperskier's avatar reaperskier January 24, 2025 / 2:30 pm

      That’s from the double chair it (indirectly) replaced.

      Like

  2. Mishers's avatar Mishers January 24, 2025 / 3:06 pm

    What will happen to the double?

    Like

Leave a reply to Mishers Cancel reply