Red – Troll, BC

This T-Bar spans almost 6,500 feet with 1,500 feet of vertical.
Diesel drive.
Loading area.
View leaving the base area.
Tower 5.
View back down the line.
Looking up at tower 8.
Upper lift line.
Breakover towers at the summit.
Top tension station. Until the Silver lift was built, this was the top of the mountain.
Upper terminal.
Side view of a tower.
Upper station overview.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s