Sessel – The Summit at Snoqualmie, WA

alpental 4-22-07 018
Looking down the lift line.
alpental 4-22-07 019
Upper lift line.
alpental 4-22-07 022
Top terminal.
alpental 4-22-07 024
Unload ramp and top bullwheel.
alpental 4-22-07 045
Bottom loading area.
alpental 4-22-07 048
Vault drive station.
alpental 5-6-07 016
Tension terminal.
IMG_3957
Motor room and lift line.
Upper terminal overview.
Drive bullwheel.
Lift line overview.

11 thoughts on “Sessel – The Summit at Snoqualmie, WA

  1. Joe Blake February 2, 2018 / 9:10 pm

    I wish it was still yellow. I miss coloured chairs.

    Like

  2. Kevin November 7, 2022 / 9:30 am

    Best intermediate chair at Alpental

    Like

  3. Kevin April 9, 2023 / 12:19 pm

    Is this lift still up?

    Like

      • hahahcat April 9, 2023 / 1:18 pm

        ok because i was confused after looking at the live webcam.

        Like

      • Kevin April 10, 2023 / 5:14 pm

        I just contacted the manager of the S@S for a clear date.

        Like

  4. Kevin September 1, 2023 / 3:37 pm

    This lift is completely gone now

    Like

  5. hahahcat October 12, 2023 / 11:24 am

    This is the beginning of the end.

    Bye Sessel Riblet.

    Like

  6. Aaron W November 14, 2023 / 12:57 am

    Ive been in that vault drive and talked with a lift mechanic, he explained every component to me and its purpose. What got me interested in the construction and engineering of these beautiful machines

    Like

Leave a reply to Kevin Cancel reply