  1. Paul's avatar Paul May 2, 2021 / 6:41 am

    Some activity between the Avalanche and Tyrol lifts (ancient fixed 3-seaters) at 7Springs. Avalanche partially dis-assembled. Many trees cleared at the top. Construction trailer reads “Doppelmayr”. I’ve got a few pictures…

    Like

  2. John M.'s avatar John M. May 3, 2021 / 12:40 pm

    I think some of the data for the North Face lift is incorrect. It says the vertical rise 374 but it has a very similar vertical to Giant Steps and Gunnar, which can be seen on the trail map. Therefore length and ride time should be much longer. The lift normally takes 8-10 mins to ride.

    Like

  3. Kam's avatar Kam May 29, 2022 / 12:25 pm

    I wonder what Vail will do to this place now that they own it. I feel like North Face lift has to be made detachable soon enough. And Tyrol and Giant Steps lift will probably receive Safety Bars. I don’t know what else they’ll do, I guess we’ll see