Summit – Berkshire East, MA

One of the earliest Skytrac complete lifts, this quad services the summit and operates in multiple seasons.
Lift overview.
Monarch drive station.
The top station set up for summer operations.
Return bullwheel.
View down the lift line.
Middle section of the line.
This lift is quite steep.

One thought on “Summit – Berkshire East, MA

  1. Will November 13, 2020 / 9:35 am

    This lift is not the most reliable lift, it breaks down quite often leaving people to use the mountain top triple. Also, small children have a very hard time with the loading gates and the chair kit carpet besides that, this lift was a massive upgrade to the summit triple.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s