Not sure what video you are referring to but remember Vail started operating Canyons in 2013, a year and a half before they bought Park City. I looked back through my pictures and there were no safety bars in 2010-11 but were in 2014-15. Before both of those the lift had quad chairs with bars. Go figure!
I’ve noticed that on some CTEC installations they have small mounting brackets on the backrest of the chairs. I don’t know if all of them have this but in this instance it would make it a lot easier for Park City to just put them on.
Here’s the video, you can see the bars and they also have footrests? Wonder where they got the bars from since they discontinued those CTEC Chair styles by then when they Out them on.
Yep, that was post-Vail, pre-merger. Town lift also got bars in 2015. I would guess Doppelmayr fabricated new ones for their best customer. Skytrac is also just down the road with CTEC heritage.
Town lift had bars prior to 2015, but only during the summer months. I remember being specifically told by a PCMR employee circa 2010 that they were pulled off for winter. Additionally, they only had chair cushions on half of the chairs during the summer. (I may be able to find a picture if anyone’s interested) The other half of the chairs were used for mountain bike haul. Now, town lift has bars year round, and no longer does summer mountain bike haul. Last time I skied Park City (it was in 2019) I didn’t take a close look at Town, but I would guess that Vail/PCMR re-used (some of) the bars they had from summer operation.
Another fun fact about Town, is that they have downloading in the winter now too.
I am more interested in who fabricated bars for the Jupiter and Thaynes lifts. Those are YAN chairs, but I’m sure Dopplemayr could’ve come up with a design for them.
The rope on a lift is specifically sized for the load it will serve. Unless it didn’t pass a test, putting on double chairs instead of quads wouldn’t have been done to ‘reduce stress’.
This lift began life as Red Hawk, starting from the Wolf Mountain parking lot and ending around where it ends now. Then it was shortened when American Skiing Company started building the village around 1998, both times as a quad with footrests as I recall, back in the glory days before ASC ran out of money. Then it was moved to its current alignment, a few hundred yards south of the old one, and renamed Sunrise, now hardly operating. I think it was converted to a double after it was relocated, not at the same time.
One thing weird about this lift is that it has restraint bars with footrests, something that only a handful of other lifts at the Canyons side of the resort have.
Skilifts.org has pictures of this lift at Red Hawk. The winter pictures were taken in 2003, and I think the lift was shortened/relocated after that season.
Nevermind, it started off as Saddleback. This lift has to be the most relocated lift. Saddleback > Raptor > Red Hawk > Red Hawk (shortened) > Sunrise (Quad | Double).
Raptor became Dreamscape not Red Hawk. There is actually a liftblog article about chairs that have been moved around and Saddleback/Raptor/Dreamscape is specifically mentioned.
Over and Out will only be for downloading. A new Sunrise is in the Plans with a high speed quad from the new Pendry Hotel (about 50 yards further down to Red Pine. Probably two years
The top terminal (or Over and Out) near by the top of Sunrise already has had some concrete work done. You can also see the cut trees for where the new Over and Out lift line will be. Should be a nice addition to this part of the resort!
Given the incredible amount of real estate being developed at Canyons Village currently, I have to think this lift might get replaced soon. They are currently building a plaza and ski beach right at the base of this lift, so it feels like a lift might be coming next. Should be a really interesting project. The bottom terminal will be a tight squeeze in between all of the development, and the alignment/top terminal will also be interesting due to all the private property lines.
I would like to see a lift built from here to Red Pine Lodge, perhaps a gondola. Also, put in a separate lift from Red Pine Lodge to the top of Tombstone to allow people to transfer over to the rest of the resort while avoiding the Tombstone bottleneck.
The last time I was in Park City, I attended a real estate presentation for one of the new developments over here. They mentioned that they were planning on upgrading the Sunrise lift in the immediate future but gave no further details.
The new Pendry hotel has been hyping the upgraded lift in their sales materials and other developments in the area were told the upgrade would be summer of 2022 but it wasn’t announced in the Vail resorts upgrade list today so who knows….
Here’s also my video (yes I’m actually skiliftguy on Youtube) Not only is this lift currently pointless, but also runs so slow at around 350 fpm so even though it is technically a short lift, the ride time still tops at around 7 minutes.
The Lift has safety bars in a video of the Lift, Did they add them to the chairs?
LikeLike
Vail Resorts puts bars on all lifts they acquire along with fall protection on all ladders and a host of other risk management type items.
LikeLike
But the video was before vail resorts acquired and the two areas merged.
LikeLike
Not sure what video you are referring to but remember Vail started operating Canyons in 2013, a year and a half before they bought Park City. I looked back through my pictures and there were no safety bars in 2010-11 but were in 2014-15. Before both of those the lift had quad chairs with bars. Go figure!
LikeLike
I’ve noticed that on some CTEC installations they have small mounting brackets on the backrest of the chairs. I don’t know if all of them have this but in this instance it would make it a lot easier for Park City to just put them on.
LikeLike
Here’s the video, you can see the bars and they also have footrests? Wonder where they got the bars from since they discontinued those CTEC Chair styles by then when they Out them on.
LikeLike
https://m.youtube.com/watch?v=SQfLGwgLqeM
LikeLike
Yep, that was post-Vail, pre-merger. Town lift also got bars in 2015. I would guess Doppelmayr fabricated new ones for their best customer. Skytrac is also just down the road with CTEC heritage.
LikeLike
Town lift had bars prior to 2015, but only during the summer months. I remember being specifically told by a PCMR employee circa 2010 that they were pulled off for winter. Additionally, they only had chair cushions on half of the chairs during the summer. (I may be able to find a picture if anyone’s interested) The other half of the chairs were used for mountain bike haul. Now, town lift has bars year round, and no longer does summer mountain bike haul. Last time I skied Park City (it was in 2019) I didn’t take a close look at Town, but I would guess that Vail/PCMR re-used (some of) the bars they had from summer operation.
Another fun fact about Town, is that they have downloading in the winter now too.
I am more interested in who fabricated bars for the Jupiter and Thaynes lifts. Those are YAN chairs, but I’m sure Dopplemayr could’ve come up with a design for them.
LikeLike
Why did they downgrade it from a quad
LikeLike
Because not too many people ride the lift. And reduce stress on the rope.
LikeLike
The rope on a lift is specifically sized for the load it will serve. Unless it didn’t pass a test, putting on double chairs instead of quads wouldn’t have been done to ‘reduce stress’.
LikeLike
This lift began life as Red Hawk, starting from the Wolf Mountain parking lot and ending around where it ends now. Then it was shortened when American Skiing Company started building the village around 1998, both times as a quad with footrests as I recall, back in the glory days before ASC ran out of money. Then it was moved to its current alignment, a few hundred yards south of the old one, and renamed Sunrise, now hardly operating. I think it was converted to a double after it was relocated, not at the same time.
LikeLike
I think it will have to be converted back to a quad once over and out is operating.
LikeLike
One thing weird about this lift is that it has restraint bars with footrests, something that only a handful of other lifts at the Canyons side of the resort have.
LikeLike
The only other two that do are Dreamscape and Orange Bubble.
LikeLike
Won’t Over and Out be one-way (Tombstone back to Canyons base)?
LikeLike
Skilifts.org has pictures of this lift at Red Hawk. The winter pictures were taken in 2003, and I think the lift was shortened/relocated after that season.
LikeLiked by 1 person
This lift actually started its life as Raptor and has been relocated 3 times.
LikeLike
Nevermind, it started off as Saddleback. This lift has to be the most relocated lift. Saddleback > Raptor > Red Hawk > Red Hawk (shortened) > Sunrise (Quad | Double).
LikeLike
Raptor became Dreamscape not Red Hawk. There is actually a liftblog article about chairs that have been moved around and Saddleback/Raptor/Dreamscape is specifically mentioned.
https://liftblog.com/2015/10/31/374-lifts-that-arent-where-they-used-to-be/
LikeLiked by 1 person
Sunrise has 74 chairs and 8 towers, 495 vertical rise and I guess around 2,100 ft in length
LikeLike
Over and Out will only be for downloading. A new Sunrise is in the Plans with a high speed quad from the new Pendry Hotel (about 50 yards further down to Red Pine. Probably two years
LikeLike
The top terminal (or Over and Out) near by the top of Sunrise already has had some concrete work done. You can also see the cut trees for where the new Over and Out lift line will be. Should be a nice addition to this part of the resort!
LikeLike
Given the incredible amount of real estate being developed at Canyons Village currently, I have to think this lift might get replaced soon. They are currently building a plaza and ski beach right at the base of this lift, so it feels like a lift might be coming next. Should be a really interesting project. The bottom terminal will be a tight squeeze in between all of the development, and the alignment/top terminal will also be interesting due to all the private property lines.
I would like to see a lift built from here to Red Pine Lodge, perhaps a gondola. Also, put in a separate lift from Red Pine Lodge to the top of Tombstone to allow people to transfer over to the rest of the resort while avoiding the Tombstone bottleneck.
LikeLike
The last time I was in Park City, I attended a real estate presentation for one of the new developments over here. They mentioned that they were planning on upgrading the Sunrise lift in the immediate future but gave no further details.
LikeLike
The new Pendry hotel has been hyping the upgraded lift in their sales materials and other developments in the area were told the upgrade would be summer of 2022 but it wasn’t announced in the Vail resorts upgrade list today so who knows….
LikeLike
Why isn’t the Sunrise lift operating this season?
LikeLike
Could very much be a staffing issue.
LikeLike
A lot of Park City lifts aren’t running this year due to lack of staff.
LikeLike
Any word on if Sunrise will operate this year?
LikeLike
Based on everything we have heard from our HOA, all signs point to yes….
LikeLike
Here’s also my video (yes I’m actually skiliftguy on Youtube) Not only is this lift currently pointless, but also runs so slow at around 350 fpm so even though it is technically a short lift, the ride time still tops at around 7 minutes.
LikeLike