This Leitner-Poma Omega detachable was built in 2011.Top station.View down the short lift line.Upper part of the line.Towers 1 and 2.The drive terminal.Lift overview.Side view of the bottom station.Top terminal seen from below.
I believe the first LPA style lifts would have been built in 2012. This is because I remember first seeing them at Palisades as Big Blue which was built in 2012. Its possible there was one in 2011 that I am not aware of
This lift and Paradise Express at Marmot Basin were the last Leitner-Poma HSQs with the omega terminal each built in 2011.
LikeLike
I didn’t know Omegas were still produced in 2011!
LikeLiked by 1 person
I believe the first LPA style lifts would have been built in 2012. This is because I remember first seeing them at Palisades as Big Blue which was built in 2012. Its possible there was one in 2011 that I am not aware of
LikeLike
What about high noon express at vail? It was built in 2010 I think.
LikeLike
Yes, it was. First LPA ever built.
LikeLike