Superstar Six Express – Killington, VT

This lift replaced a Yan-Poma detachable quad for the 2025-26 season. Note the generator next to the drive terminal.
Unloading area at the top of Superstar Glacier.
Six place EJ chair with puck style footrests.
Canadian style tower along the lift line.
Upper station overview.
This is also the first Doppelmayr lift for Killington.
Upper half of the line seen from Snowshed.
Tower 4.
European style tower head.
Chair maintenance bay next to the drive station.
Breakover towers at the summit.
View down the upper line.
Looking up at the top terminal.
Middle section of the line.
A tower with combo assemblies on both sides.
The top few towers.
Most of the line has no ski under clearance.
Lift line with closely-spaced HKD guns.
View up the line.
Lower lift line.
Lift line crossing the Superstar run, which hosts the World Cup most years.
The first few towers.
Side view of the return terminal.
Lower station with Doppelmayr operator house.
90 degree loading.
UNI-G tension return station.
Loading gates.
Unloading area.
Lower station overview.
View up from the bottom terminal.

2 thoughts on “Superstar Six Express – Killington, VT

  1. SkiLucas's avatar SkiLucas December 5, 2025 / 6:14 pm

    Looks nice!

    Like

  2. Skier's avatar Skier December 8, 2025 / 6:19 am

    what a amazing lift

    Like

Leave a reply to Skier Cancel reply