Doppelmayr CTEC Uni-GS bottom terminal.Riding up.Middle portion of the line.Bottom station with parking rail.Not all chairs can be parked here but there is enough space for the chairs that would be parked above treeline.Depression towers 20 and 21.The big top breakover.Top terminal seen from the Harmony zone.Final steep pitch.View up the above treeline portion of the line.Looking down the line and toward Blackcomb.Upper lift line.Doppelmayr CTEC merger era towers and chairs.Tower 1.View up the treed portion of the lift line.Riding near the summit.View back down the Symphony Amphitheatre.Breakover towers.Arriving at the summit.Unloading area.Top station overview.Uni-GS station.Another view of the final three towers.The top bowl.Amphitheatre seen from Blackcomb Mountain.Doppelmayr Worldbook entry.
Is this the only UNI-GS at Whistler?
LikeLike
I think so. The old lift that is now Strawberry Express was a GS, but got taken out after the Olympics
LikeLike