Timberline – Bolton Valley, VT

The Timberline expansion opened in 1986 with this Doppelmayr quad.
Lift overview.
Loading area and hydraulic tension system.
Uphill side of the drive station.
View up from the bottom terminal to the mid-station.
The first unload.
The section above the midstation is short with a portal tower 13.
Looking down the line.
Unload ramp and operator house at the mid.
Top bullwheel.
Return terminal on Timberline Mountain.

3 thoughts on “Timberline – Bolton Valley, VT

  1. Ryanvt's avatar Ryanvt March 5, 2024 / 8:58 am

    There is a chair #007 between chairs 91 and 92.

    Like

    • Grant Edebohls's avatar Grant Edebohls March 16, 2024 / 5:39 pm

      I’ve been on 007 a few times i wonder why they did that the lift dose have a chair 7

      Like

      • Ben Havas's avatar Ben Havas February 25, 2025 / 6:45 pm

        It does, they just added it in there. (Meaning that despite the last chair number being 100, there are actually 101 chairs on the lift)

        Like

Leave a reply to Grant Edebohls Cancel reply