Timberwolf – Lutsen Mountains, MN

This lift services some of the newest terrain at Lutsen and will service more trails if an expansion into the Superior National Forest is approved.
The lift came used from Colorado.
Vault drive.
Breakover towers.
Another look at the top station.
Upper part of the lift line.
Lower lift line.
Side view of the return-tension station.
Counterweight.
Another view of the loading area.
Lift line.

17 thoughts on “Timberwolf – Lutsen Mountains, MN

  1. Charlie's avatar cfglick April 15, 2019 / 7:13 am

    This should become a high speed quad if the expansion is approved

    Like

    • Anders's avatar Anders November 19, 2023 / 2:55 pm

      Unfortunately it was denied, this will probably stay the way it is for a long time.

      Like

  2. Ryan's avatar Ryan Gardner April 15, 2019 / 9:53 pm

    where in CO did this lift come from

    Liked by 1 person

    • Utah Lost Ski Area Project's avatar Utah Lost Ski Area Project January 5, 2023 / 9:25 am

      Looking at the paint schemes, I would say one of the old Riblets at Breckenridge. I would guess it’s the former B lift which was removed in 1997 due to the lift having a vault drive (Breckenridge’s other Riblets removed in the late 90s most likely had overhead drives). This also fits the timeline well with Timberwolf having been installed between 2002 and 2005.

      Liked by 1 person

      • pbropetech's avatar pbropetech November 13, 2023 / 3:00 pm

        You’re probably right. The only other Riblets that were removed in that time frame are the ones at Aspen Highlands, but it’s only an educated guess whether they had vault drives or not. They were all ’60s vintage, so maybe.

        Like

        • A Mauch's avatar A Mauch September 14, 2025 / 11:00 am

          I had to ask around, B-lift was removed by Snowy Range.

          Liked by 1 person

      • A Mauch's avatar A Mauch November 19, 2023 / 9:54 am

        B-lift ran clockwise. Perhaps there’s a mixture of equipment from several lifts, but I don’t see any of the deep gray paint scheme from when it was removed from Breck.

        Like

        • pbropetech's avatar pbropetech November 19, 2023 / 12:36 pm

          I’ve definitely spun Riblet centre-pole baskets around when I needed a spare for a different lift, but I imagine they probably wouldn’t have done that for an entire line. I didn’t think of the paint either.

          Like

        • pbropetech's avatar pbropetech November 19, 2023 / 12:39 pm

          Plus you’d have to flip the backstop, the motor direction, the input bevel set, and the E-brake band (at a minimum). Not that it couldn’t be done, but that’s a lot.

          Like

      • bskier23's avatar bskier23 November 14, 2024 / 7:21 am

        Could this actually have come from Terry Peak SD? They had a light blue Riblet that was parallel to their main Miner Denver, both were removed around 99 I believe for their first detach.

        Like

  3. gavin's avatar gavin September 15, 2019 / 7:48 pm

    I agree with the detachable replacement but a bridge lift replacement is more important right now.

    Like

    • GrayAntito's avatar GrayAntito October 22, 2021 / 8:15 pm

      I think Bridge and Ullr would be priorities over Timberwolf. If they have the money, they probably would replace all three.

      Like

      • Lutsen_skier's avatar Lutsen_skier October 22, 2021 / 8:22 pm

        Timberwolf would be the last lift to get replaced, as most skiers just ski down to the 6 pack detach.

        Like

  4. JeffH's avatar JeffH February 27, 2020 / 2:57 pm

    I’ve skied at Lutsen for40 years, and Bridge Chair has been there the entire time. I can’t argue with Lutsen’s plans to expand, but the must do something with Bridge. A high speed quad would fit there nicely.

    Like

    • Charlie's avatar cfglick March 4, 2020 / 4:35 pm

      I agree, when they do expand hopefully the longer of the new lifts are built as detachables.

      Like

    • Zachary Phaneuf's avatar Zachary Phaneuf January 20, 2022 / 9:56 pm

      Either that or they install a detachable where the old Eagle Lift Used to be. One obstacle with the Bridge is that the alpine sliders get on halfway. But if they ran it slow enough they could probably get on

      Like

  5. chrisgmatthews's avatar chrisgmatthews February 17, 2021 / 9:29 am

    Filling in missing data: I timed this out at 8.0 minutes and 702 feet of vertical rise last week.

    Like

Leave a reply to bskier23 Cancel reply