This lift was built in 2004 and operated for only a few years before being removed by a contractor working for Bank of America.Uni-GS return terminal.The Wildwood expansion added a significant amount of terrain to the new Tamarack Resort.Upper lift line.Nearing the summit.Side view of the lower station.Drive station up top.Doppelmayr Worldbook entry.
Where did you get these photos Peter? You haven’t put them up on the website before.
LikeLike
Photo credit: Cameron Halmrast.
LikeLike
Why does the skin look like someone took a hammer to it? Is this a used lift? Or maybe some sloppy steel fabrication?
LikeLike
The second high speed quad reused all of the tower and terminal foundations of the original lift, as well as the old shacks.
LikeLike
This lift was intended to go to Wolf Creek, CO, but Doppelmayr bought it back from Bank of America!
LikeLike
Was this going to be the treasure stoke lift?
LikeLike
Probably, given its length.
Now it’s at Brian Head.